Training Lab · live build guide

Behind the scenes · how LimiterIQ is being built.

Tyson's running journal of the build itself. What's shipping, what's getting cut, what's working, what isn't. Half product diary, half methodology notes. Honest about the timeline and the trade-offs.

← Back to The Training Lab

Build posts

24

Pages currently in DNA

82

Days until launch (est.)

35

Why this room exists

I'm building LimiterIQ in public. Not for transparency theatre, because explaining the decisions out loud forces me to actually have reasons for them, and because founding-rate members are paying based on trust before product. The least I can do is show you what's happening. The honest version: prototype is 90% complete, engineering is 0% started, real launch is 4-6 weeks out. I'll post here as that changes.

TS
Tyson Schubert · Founder

today · 09:14

Smart Calendar shipped this week. The weekly view, day strip, today's highlight, move/modify flows, missed-workout safety net. Took 3 build cycles to get right, kept stripping it back. The original spec had 12 sub-pages, ended up with 6 because the others were duplicating existing pages. Pages I cut and why: calendar-insights (folded into the weekly focus banner on limiter-plan), calendar-settings (already in profile-training), safety-check (already in workout-start-gate), swap-equipment (already in workout-modify's equipment reason path), the two 'confirmed' pages (better as inline alerts on the action pages themselves).

❤️ 18 💾 4 💬 6 replies Open thread →
TS
Tyson Schubert · Founder

3 days ago

The orphan problem. Audit found 9 pages with zero incoming links. 4 are intentional (Stripe returns + error pages). 5 are real navigation problems, marketing pages I forgot to link from anywhere. Next pass: adding a Company footer column with About / Roadmap / Changelog / Press kit / Referrals / Success stories. One change, 5 orphans closed, ~400 site-wide refs added.

❤️ 23 💾 7 💬 4 replies Open thread →
TS
Tyson Schubert · Founder

1 week ago

Going to be honest about the launch timeline. The prototype is comprehensive, 81 pages, every flow documented, every page in DNA. But it's still a prototype. To actually take payments and serve real plans I need: Stripe price ID (1 hour), Supabase setup with the schema (2-3 days), webhook + access middleware (2 days), AI plan generation route (3-4 days), real auth (1-2 days), lawyer review of privacy + terms (1 week elapsed). Realistic: 4-6 weeks to first paid member. I'll keep posting here as it progresses.

❤️ 47 💾 18 💬 22 replies Open thread →

Share something with the room. Your post helps others see real patterns, not just polished highlights.

Open a new thread

Related rooms

Other places people are talking.